Fire Station 29

Fire Station 29

Fire Station 29

Fire Station 29

Fire Station 29 was remodeled according to the City of Seattle Sustainable Buildings and Site Policy to optimize environmental quality. Rushing provided sustainability consulting for the project targeting LEED-CI certification. The site remodel accommodated apparatus and administrative space as well as the day room and sleeping areas within the fire station. Sustainable features of the renovation include:

  • 48% water use reduction.
  • 22% reduction in lighting power with 100% of lighting connected to occupancy sensors.
  • Low-emitting sealants, paints and flooring.
  • Electric vehicle charging station.